gitoria
All repositories: gitoria
2.4 KB
# Plan: one shared PR-based deploy-init (#50 step 3)2026-11-09, Gitoria. Status: PLAN accepted by Apollo 2026-11-09; switch-on gitoria 2026-11-12, others after one proof PR each. Flow: branch → PR → Kunibert → merge → deploy.## Today`worldapi-conductor/deploy-init.sh <app>` checks out the local HEAD in a worktree, runs boot gate + `deploy.sh` gates, deploys, and after rc=0 runs `git push` (main). With "Refuse direct pushes to the main branch" switched on, that push is refused.## Change1. **Branch + PR.** A worker commits on a branch `<topic>` and pushes it; the PR is opened by the commit subject `|||PR ` (into main). Local main is never committed to directly.2. **Kunibert.** Kunibert reviews the PR against hybriel/docs/HL-STANDARD.md (rule ids cited) and sets status context `kunibert`. When the repo marks Kunibert required, Merge stays off until approve + success.3. **Merge.** The owner (caramboleyo, button on /pulls) or a member conductor with its own gtr_ user token: `POST /api/repos/<repo>/pulls/N/merge {"head":"<sha>"}` (apps-api.md §7; apps cannot merge).4. **Deploy.** `deploy-init.sh <app>` changes in three lines:- `git -C $d fetch -q origin main` and the worktree at `origin/main` (not local HEAD); refuse if local main has commits not on origin/main ("FAILED — unmerged local commits").- gates/boot gate/deploy unchanged.- after rc=0 no `git push`; `git -C $d merge --ff-only origin/main` keeps the local folder current.A broken merge is fixed by a new PR, never by a push to main.## Open before the switch-on- **Who merges (decided, his rule 2026-10-31 via Apollo 2026-11-09):** conductors merge bug fixes and utility changes themselves; caramboleyo merges features after accepting them. So every app conductor gets its own gitoria user (member of its repo, #48 member merge) and its own gtr_ token in `~/.config/<app>/gitoria-token`; features wait for his button.- Kunibert as **required** check per repo (today non-blocking on 9 app repos).- Records-only commits (LOG.md) also go through PRs once the setting is on; conductors batch them into one PR per day, or LOG.md moves out of git.## Switch-on (proposal)Per repo, in this order: deploy-init change live (works with the setting off too) → one proof PR per app merged + deployed → owner switches the setting on. Proposed date: 2026-11-12 for gitoria first, the other app repos after their conductors confirm one proof PR each.
Branches
- f1-broken-json
- f2-api-bugs
- gp-gate-ports
- heap-revert
- hl25-records
- ident-chooser-selector
- mainmain branch
- p51-public-pr-reads
- records-1112
- s25-no-session-on-login-error
- v59
- w52-person-approval
- w52b-approval-followup
- w52c-header-phone
- w53-pulls-speed-pr
- w54-repo-rename-pr
- w55-rename-org
- w56-owner-members
- w62-pr-close
- w63-force-push
- w64-org-slash
Latest commits
- 21aa57calog: parkmre
- e9f950a8reports: G25c soakmre
- a7783686log: deploy 9f41ffcmre
- 9f41ffc1log: W30b mergedmre
- bef635c1Merge branch 'w30b'mre
- 15b996a5Org list: keyed rows by @id, newest first, concat instead of hand loopmre
- c4f6d9e3reports: G25c growth huntmre
- b88e39f1log: privacy cleanup donemre
- bfd7826ddocs: neutral example organisation namemre
- 01b71c2edocs: neutral wording in missions, reports and logmre
- 3eeea733log: 2026-11-09 PR flow plan and membersmre
- e7c2ff1fdocs: neutral name for the apps-api reviewmre
- 120b7abdlog: step 3 queuedmre
- 358474bflog: P50 livemre
- 477d7bdcMerge branch 'p50'mre
- 00efc06fP50 reportmre
- e3f85afblog: commit mention slipmre
- 4d1a4cf4log: #25 numbersmre
- 1af0a60ddocs: H25 run() correctionmre
- eefa2dbcRepo setting: refuse direct pushes to the main branch (pre-receive over HTTPS and ssh)mre